Kohat Tunnel

Kohat Tunnel and its access roads is a part of Indus Highway which connects Karachi in the south with Peshawar in north and follows the west bank of Indus River. It is a new Highway with a 1.9 km tunnel in between its access roads. The Tunnel has been designed on a most feasible route. The project is a construction of 28.2 kms 2 lane roads and 1.9 Km long tunnel equipped with the latest facilities.

Environmental Impacts

Following are the key Environmental Impacts related to the project :-
 
Noise and air pollution during the construction by the dust.
 
 
Social and cultural set up of the local residence will be affected.
 
 
Disturbance in the natural stability of the soil.
 
 
Effects on the crossing path ways of animals